Swing Set Play Structure Blueprints How Do I Level A Backyard Wood Play Set?

How do I level a backyard wood play set? - swing set play structure blueprints

It is a gesture typical of wood with the tower and swings. We just build the tower, but found that the shipyard more than we thought slopes. My father-in-law thought I could be a stabilizing 4 of 4 plants below the structure behind. I'm not sure how safe it is. Increase the options that I think in the back and try to be landed. My only concern is that if errode after a while. The other option is to try to dig in front of the tower, which will hopefully fall. The temporary roads for drainage. Suggestions? Thank you.

5 comments:

unbeliev... said...

Your playground is stable, if we dig a hole in the ground and higher Bury Your feet into it. It is certainly safer than trying to his feet on the floor of wood or cement blocks, because: can prove stumbling 1) children, and 2) whether the changes, and because the will of the dynamics of the swing could, all things suddenly collapse and hurt someone.

Robert C said...

Use of concrete blocks. 1, move the switch from the street. They measure the distance between the legs, so that you know how to block. Blocks should not protude field, and probably should not. will be ugly for the 1, but the grass grows around him. To make sure, hills, the soil around them, thus not be visible. Use a line level to the height of the blocks and put on the swings. Kind of the same idea with the 4x4, but the concrete is slowly rotting wood, even if treated. Good luck.

sortacla... said...

Can a level of "platform" area (could be expensive, not sure). Take the train across the border and then fill with mulch or gravel in the amount and turn it into a playground.

PrettyMo... said...

Depending on the slope, all that leveling the ground where the rest of the legs. You may leave the premises on the swings and other parts to play. It will make no difference. If you have a level swing, you can fill in the gaps with wood chips or whatever you use.

John said...

dig it up and put the footers in concrete below. not two or bags should be good if done the first level and score, then the post office when needed could be reduced. Good luck

Post a Comment